The Challenge
Working within an active industrial manufacturing environment meant every stage of the project had to be carefully coordinated.
The contaminated external area required complete segregation from operational zones, while maintaining safe access routes and ensuring strict compliance with asbestos legislation.
The project also demanded:
- Large external containment structures
- Full exclusion zones
- Negative pressure systems
- Continuous air monitoring
- Careful waste handling and decontamination procedures
- Protection of surrounding operational areas
Our Solution
Our experienced team designed and implemented a fully controlled external asbestos removal enclosure capable of safely containing the works throughout the programme.
Control measures included:
- Construction of a large weatherproof external enclosure
- Fully equipped decontamination and welfare facilities
- Negative Pressure Units (NPUs) maintaining controlled airflow
- Continuous air monitoring using Pascal monitoring equipment
- Controlled removal of Amosite slurry and contaminated ground materials
- Licensed asbestos waste management and disposal
- Daily site inspections and compliance monitoring
By combining detailed planning with experienced site management, the project progressed safely while minimising disruption to the client’s ongoing operations.
The Result
The contaminated area was successfully remediated, allowing the client to progress with the next stage of their site works.
The project demonstrated MD Environmental’s ability to safely manage complex external asbestos removal projects within live industrial environments, combining strict compliance with efficient project delivery.
Services Provided
- Licensed Asbestos Removal
- External Asbestos Enclosures
- Amosite Removal
- Ground Contamination Removal
- Industrial Asbestos Remediation
- Negative Pressure Enclosures
- Air Monitoring
- Licensed Waste Disposal
get in touch.