Completion DateNovember 2026
CategoryEducation
Project TypeFloor Tile & Adhesive Removal (Weekend Works)
LocationSouth East
Floor Tile & Adhesive Removal – School, South East
The Challenge
A school in the south east of England needed 120 m² of floor tiles and the adhesive underneath them removed. The work had to happen while the building was empty, so the space was ready again for the start of the school week.
Our Solution
MD Environmental planned the works over a single weekend:
- Work started on the Friday evening and ran over three shifts
- The room was sealed with an airlock and a negative pressure unit, with an exclusion zone keeping the stairs and access routes closed
- All 120 m² of floor tiles were lifted and the adhesive removed
- An independent analyst carried out visual inspections and air testing throughout the works
The Result
The area was handed back to the school on the Sunday, cleared and tested, ready for pupils and staff on Monday morning.