Completion Date2026
CategoryIndustrial
Project TypePost-Fire Environmental Clean (12 Days)
LocationEssex / South East
Post-Fire Environmental Clean of Production Offices – Fine Art Workshop
The Challenge
The recovery programme at the fine art workshop continues. Following Phase Three, the MD Environmental team moved on to the next area as works progressed on the site: the production offices.
The production offices were full of items that all had to be removed, cleaned and put back. Stock had to stay in its original position, so everything had to go back exactly where it came from.
Our Solution
- Items removed, cleaned and put back: everything was taken out, cleaned and returned, with stock kept in its original position.
- Environmental clean: a full environmental clean of the production offices.
- Black fire soot cleaned: the clean included the black soot left behind by the fire.
- Non-cleanable items disposed of: anything that could not be cleaned was removed for disposal.
The Result
The works were complete in 12 days: the production offices cleaned of fire soot, non-cleanable items disposed of and the stock back in its original position. Another area of the site recovered as the programme moves on.
get in touch.