Controlled AIB Removal – Amersham
The Challenge
MD Environmental was instructed to carry out controlled asbestos removal works in Amersham, involving AIB across multiple work areas and additional adhesive removal within a staircase.
The project required the construction and management of three separate enclosures, all operating under fully controlled conditions.
With multiple work zones and strict safety requirements in place, careful planning and coordination were essential to ensure compliance, efficiency, and a clean finish within a tight programme.
Our Solution
The MD Environmental team delivered a fully controlled solution, ensuring all works were carried out safely and in line with current asbestos regulations.
Key elements of the works included:
- Construction and maintenance of 3 enclosures
- Decontamination unit (DCU) connected to all enclosures
- Fully controlled removal of AIB materials
- Removal of adhesive from a staircase area
- Strict control measures implemented and maintained throughout
All works were carefully planned and executed to ensure safety, containment, and efficiency from start through to completion.
The Result
The project was completed safely, efficiently, and within just 6 days, meeting all compliance requirements and delivering a clean, controlled finish.
This project highlights MD Environmental’s ability to manage multi-enclosure asbestos works, maintaining high standards of safety and precision while working to tight timeframes.
Another solid result delivered through planning, precision, and execution.