Boiler Room / Plant Room Asbestos Management Works. MD Environmental Services UK

The Manorway, Corringham, Stanford-le-Hope SS17 9LA

hello@md-env.com

Completion DateNovember 2025
Project TypeAsbestos insulation to two surge tanks
LocationLondon
CategoryIndustrial

Asbestos Insulation Removal | London Energy Surge Tanks

The Challenge

MD Environmental was instructed to carry out asbestos insulation removal works on two surge tanks at a London Energy facility.

The project required urgent intervention to enable essential repair works to take place. However, the plant needed to remain operational throughout the programme, meaning that one surge tank had to remain live at all times to ensure critical machinery could continue operating safely.

Working within a busy industrial energy facility presented additional challenges, including restricted working areas, live mechanical services and strict operational safety requirements. Careful coordination with the site’s engineering teams was essential to ensure the works could progress without impacting plant operations.

Delivering the works safely while maintaining operational continuity required detailed planning, phased working and precise site management.

Asbestos Insulation Removal London Energy Surge Tanks Project 2

Our Solution

MD Environmental developed a phased programme that allowed works to be completed while maintaining full operational functionality of the plant.

Key elements of the works included:

Phased asbestos insulation removal to ensure one surge tank remained operational at all times

Implementation of extended 12-hour shifts to maximise productivity and minimise downtime

Close coordination with London Energy shift engineers to safely manage plant operations during works

Carefully controlled removal procedures carried out within a live industrial environment

The project was delivered in collaboration with G J Bowmer Waste Disposal Limited, supporting the safe and efficient completion of the works.

The Result

Through careful planning and close collaboration with the client’s engineering team, MD Environmental successfully delivered the works while maintaining continuous plant operations.

The phased approach ensured that urgent repair works could proceed without interrupting critical machinery, allowing the facility to continue operating safely throughout the programme.

This project demonstrates MD Environmental’s ability to operate within complex, high-risk industrial environments where safety, coordination and operational continuity are essential.

Another example of the trust placed in MD Environmental to deliver specialist works in live infrastructure facilities.

get in touch.

Ready to work with us?

Find us on social

A team you can rely on

Nationwide Support

Get in touch!